D.A. Hogan and associates worked with the Issaquah School District on the stadium field and running track renovation project. The existing synthetic turf surface was removed, the elastic layer was repaired and a new infilled synthetic turf surface was installed with markings for football, soccer, men’s and women’s lacrosse and a mid field logo. Soccer goal anchors were installed per current NFHS recommendations to secure goals from over-tipping and the football goal posts were remove for reconditioning and reinstalled. Improvements were also made to the quick coupling valves and electrical boxes within the field areas.
Also included in the project were the running track and field events areas. The existing rubberized surfacing was removed from the track and field event areas and both “D” zones, the porous asphalt surfaces were pressure washed and a new base mat/structural spray was installed. Improvements were also made to the field events and perimeter.
|
|
|
|
|
|