|
|
|
|
|
|
|
|
|
|
Torrey Pines High School
D.A. Hogan was the lead consultant for the athletic field replacement and track and field event resurfacing project at Torrey Pines High School for the San Dieguito Union High School District. This project included removal of the existing synthetic turf, repair on the aggregate base, a new supplemental elastic layer pad was installed along with new infilled synthetic turf surfacing with markings for football, soccer, lacrosse and field hockey. Other field improvements included repairing the edge anchor and reconditioning of the goal posts. The track and field event areas were pressure washed and received a new polyurethane layer to the existing surface. The track was striped and certified for competition use.
|
|
|
|
|
|