El Camino High School
D.A. Hogan served as the prime consultant for development of athletic facilities Master Plans for two High Schools in the Oceanside Unified School District. Alternate site plans were developed for each site, evaluating current and future field and court needs for athletics and physical education. Cost estimates were prepared and a Phasing Plan developed for each site. In spring 2008 a bond was passed for the Phase 1 improvements at Oceanside and El Camino High School, with construction completed in Fall 2010.
Phase 1 improvements at El Camino High School include a new stadium synthetic field and rubberized track surface, addition of approximately 800 seats for visitor use, a new visitor restroom and concession facility, accessibility improvements for home concession and press box areas, and a revised access and circulation plan for event management.